OPT OpenIR  > 半导体激光器专利数据库
Method For Operating A Power Management Device, Power Management Device And Computer Program
其他题名Method For Operating A Power Management Device, Power Management Device And Computer Program
LEHMANN, THOMAS; REINSCHKE, JOHANNES
2017-09-07
专利权人SIEMENS AKTIENGESELLSCHAFT
公开日期2017-09-07
授权国家美国
专利类型发明申请
摘要A method for operating a power management device for controlling an operating device connected to a power supply network, in which the maximum demanded and/or provided output of the controlled operating device is at least 3 kW, is disclosed. An information data set is received which describes coupling information or a temporal progression of coupling information from a server device associated with a network provider of a power supply network, the coupling information describing a relationship between a device load of the operating device and a target variable to be optimized. A load profile is determined which describes a predicted temporal progression of the device load by optimizing the load profile with respect to the target variable. The load profile is provided to the server device, and the power management device may control the operating device according to a default value which is predetermined based on the load profile.
其他摘要公开了一种用于操作用于控制连接到供电网络的操作装置的电力管理装置的方法,其中受控操作装置的最大需求和/或提供的输出为至少3kW。接收信息数据集,其描述来自与供电网络的网络提供商相关联的服务器设备的耦合信息或耦合信息的时间进展,该耦合信息描述操作设备的设备负载与目标变量之间的关系。要优化。确定负载简档,其通过相对于目标变量优化负载简档来描述设备负载的预测时间进展。负载简档被提供给服务器设备,并且电力管理设备可以根据基于负载简档预先确定的默认值来控制操作设备。
主权项A method for operating a power management device for controlling an operational facility connected to a power supply network, wherein the maximum power level demanded and/or supplied by the controlled operational facility is at least 3 kW, the method comprising: a. receiving, from a server device which is associated with a network operator of a power supply network or with a power supplier, an information data set which that describes a coupling information item or a temporal variation of the coupling information, wherein the coupling information describes a relationship between a facility load caused by the operational facility and a target variable to be optimized during an optimizing interval, b. determining, by the power management device, a load profile which describes a predicted temporal variation of the facility load of the operational facility during the optimizing interval, by optimizing the load profile with respect to the target variable, c. providing the load profile to the server device, and d. controlling, by the power management device, the operational facility in the optimizing interval based on a specified value for the facility load pre-set by the load profile for a current operating time point.
申请日期2015-09-03
专利号US20170256908A1
专利状态失效
申请号US15/507972
公开(公告)号US20170256908A1
IPC 分类号H01S5/065 | G01J3/10 | H01S5/10 | H01S5/40 | H01S5/00 | H01S5/042
专利代理人-
代理机构-
文献类型专利
条目标识符http://ir.opt.ac.cn/handle/181661/51729
专题半导体激光器专利数据库
作者单位SIEMENS AKTIENGESELLSCHAFT
推荐引用方式
GB/T 7714
LEHMANN, THOMAS,REINSCHKE, JOHANNES. Method For Operating A Power Management Device, Power Management Device And Computer Program. US20170256908A1[P]. 2017-09-07.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[LEHMANN, THOMAS]的文章
[REINSCHKE, JOHANNES]的文章
百度学术
百度学术中相似的文章
[LEHMANN, THOMAS]的文章
[REINSCHKE, JOHANNES]的文章
必应学术
必应学术中相似的文章
[LEHMANN, THOMAS]的文章
[REINSCHKE, JOHANNES]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。